Volunteers are needed for some work on Saturday morning - see Twitter here. Am sure the Burgermonster will be here early and able to provide the odd bacon roll and cup of tea for anyone who is able to help for a few hours.
https://twitter.com/AFCRD/status/890263966546612225
[ Sat 29th Jul ] VOLUNTEERS - HAYDEN ROAD
-
- Posts: 187
- Joined: Tue Aug 21, 2012 9:13 am
Re: [ Sat 29th Jul ] VOLUNTEERS - HAYDEN ROAD
Indeed I will be. If you get hungry, I can make you some breakfast.
-
- The Staff
- Posts: 6223
- Joined: Sun Dec 27, 2009 9:00 pm
- Has Liked: 1 time
- Been Liked: 102 times
Re: [ Sat 29th Jul ] VOLUNTEERS - HAYDEN ROAD
Thanks to those that are down here at Hayden Road this morning for some pre-match groundworks, concreting far side path, ladies toilet entry, and turnstile entryway onto road.
Re: [ Sat 29th Jul ] VOLUNTEERS - HAYDEN ROAD
Fair play to every volunteer,brilliant togetherness! Also big well done to Dunc R smashing that wall/steps out so the tunnel could be fitted.Hayden rd has improved massively and now looking a tidy little ground.
-
- The Staff
- Posts: 6223
- Joined: Sun Dec 27, 2009 9:00 pm
- Has Liked: 1 time
- Been Liked: 102 times
Re: [ Sat 29th Jul ] VOLUNTEERS - HAYDEN ROAD
They built the walls/steps strong back in the day. Not sure if that Wall/Steps were from the 50's or earlier, as there were other steps into the stand at each end until recently. Maybe somebody can remember? It was fully infilled with stone/gravel as well, so luckily we had an 4 or 5 volunteers on Friday to help barrow it up to the top out of the way - many barrow runs, plus a top up of Lucozade Sport. And they thought they were coming just to paint ;-)
We then re-infilled with Northamptonshire Dry Stone Walling using the concrete from the steps before boarding up. Still work to do on the floor surface in that area to level it up.
This work was important so that we could get the Tunnel put in (same tunnel we had at the DnD) which is a requirement for grading.
We then re-infilled with Northamptonshire Dry Stone Walling using the concrete from the steps before boarding up. Still work to do on the floor surface in that area to level it up.
This work was important so that we could get the Tunnel put in (same tunnel we had at the DnD) which is a requirement for grading.
-
- The Staff
- Posts: 6223
- Joined: Sun Dec 27, 2009 9:00 pm
- Has Liked: 1 time
- Been Liked: 102 times
Re: [ Sat 29th Jul ] VOLUNTEERS - HAYDEN ROAD
And a bit more to do this week - contact Matt Parker as per twitter.
https://twitter.com/AFCRD/status/891674711641518080

Disclaimer: Do not point a high pressure jetwash directly at somebody.
https://twitter.com/AFCRD/status/891674711641518080

Disclaimer: Do not point a high pressure jetwash directly at somebody.