[ Ground Grading Update ] Works Progress ahead of Sat 2nd March Match

Post by Dazzler »

As part of the ground grading requirements needed for AFCR&D, a number of works have been taking place at Hayden Road over the last weeks, in order to be compliant for the deadline at the end of March.

Further to the previous update - http://www.afcdiamonds.com/hayden-road- ... date-21219

In the update below, we include a few pictures (as pictures are always better than words).

[All pictures come from myself, and various volunteers that have been assisting on the work - using local Trades where required, though we have supplemented that work with the volunteers for final finish etc.. in most cases.]

We have a fairly regular group of volunteers and we use Whatsapp in general to arrange when things are going on for ease, so if you are able to help at times feel free to contact Matt Parker at the club shop - or contact members @ afcdiamonds.com and we can get you added or let me know of others availability for planning - some work happens during the week, and others often on a Sunday morning 10am onwards.]

Taking each area in turn, will include details for each below.
Dazzler
The Staff
Posts: 5360
Joined: Sun Dec 27, 2009 9:00 pm
Has Liked: 1 time
Been Liked: 87 times

Re: [ Ground Grading Update ]

Post by Dazzler »

--
1/ Work has started yesterday (21st Feb) on the internal changing room work to comply with the new FA Regulations of 18 square metres. The new changing room configuration will be complete in time for the AFC Rushden & Diamonds home fixture against Alvechurch on 2nd March
--

This work is almost complete - with some final painting etc. due to be done this Friday, ahead of the match on 2nd March v Alvechurch. The walls were moved about 30cm in each changing room to make the required 18 meters squared - Home now being 18.4 and away 18.1 - am sure the players will notice the extra space (not). This meant we lost the existing Officials Room, which has now reverted to its original role (from 1922) as a corridor into the stand. The Officials now move to 2 new cabins at the back of the stand - 1 primary cabin, and 1 supplementary and for Female Officials as required. The players will also now enter through the original players/directors entrance which is just to the left of the main existing turnstile.

The Changing Room floors will be redone probably after this weekend to allow plenty of time to dry out (at this time of year the floor paint takes a little longer to go off) - this will be an Anti-Slip Grey, as previously and will freshen up the changing rooms.

[Note: This was mostly previously put on the members forum]

Changing Room Update - increase in size and reinstatement of the original Players Entrance.

B A C K G R O U N D

As you are probably aware, the existing changing rooms - that have been in use since the 1922 Stand opening, in a few configurations (but same size) with doors in one other location, were just under the new FA limit of 18 square meters for the level that we are now at.

The existing changing rooms are about 17.0-17.2 metres squared, so just over 0.8 square meters too small.

Per FA Grade C Guidelines
--
3. DRESSING ROOM FACILITIES
3.1 Players
Separate dressing rooms must be provided for both teams within the enclosed area of the ground. The dressing rooms must be of sound construction and be of a permanent nature. Existing dressing room dimensions will be acceptable provided they are a minimum of 12 square metres, excluding shower and toilet areas. Where clubs are planning to build new dressing rooms these must be a minimum size of 18 square metres, excluding shower and toilet areas.

NB Clubs need to be aware of the increase to a minimum size of 18 square metres, excluding shower and toilet areas, as from 31st March 2019.
--
Related Stories
https://www.bbc.co.uk/sport/football/46061226

Pre-Works

The final game in the existing configuration was R&HUFC v Bugbrooke on Wednesday night (20th Feb).

Home changing room (post cleaning, before final match).
Home1.png
Home1.png (1.16 MiB) Viewed 2210 times
Ref's Room post match - this will become a corridor in the new layout - linking to the original Door/Players entrance.
ref1.png
ref1.png (581.57 KiB) Viewed 2210 times
Home2.png
Home2.png (662.61 KiB) Viewed 2210 times
NEW LAYOUT

In order to increase the size of the changing rooms, we needed to take some space from the Referee's Changing Room, which then made that too small to use - so the officials changing room(s) have now been relocated to Portacabins in the area to the left of the new players entry behind the Main Stand. Officials access the tunnel from the main doorway to reach the pitch. See another thread to follow about the Officials Portacabins - these are just about commisioned - Electrics/Water done, just some final pipework and cleaning - they will be used by Officials for 2nd March Match.

Each changing room expanded in length by about 30-40cm each, and this then left the newly formed tunnel (4) from new entrance to pitch/tunnel access.

See this diagram below - note - dimensions very slightly changed from this earlier draft.
Layout1.png
Layout1.png (94.4 KiB) Viewed 2210 times
The HOME changing room (3) on the left, is now 18.4m2 and Away (5) on the right, 18.1m2.
Dazzler
The Staff
Posts: 5360
Joined: Sun Dec 27, 2009 9:00 pm
Has Liked: 1 time
Been Liked: 87 times

Re: [ Ground Grading Update ]

Post by Dazzler »

DAY 1 (Demolition of original 1922 Changing Room Walls) - Thursday Feb 21st.

First up - the Officials Room (which contained Shower/Toilets/Sink etc..) was emptied, and all plumbing capped off for now (pipework for home showers - hot/cold supply will be re-routed after main build done).

Benches removed from the walls that are being removed.
Home3.png
Home3.png (1.33 MiB) Viewed 2209 times

Then the builders opened up the easier bricks first, that were in the original doorways into the changing rooms from the original tunnel area. It is thought this was changed in the early 70's, possibly around the same time as the clubhouse was built, but if anyone knows, then please comment.
Home4.png
Home4.png (1.26 MiB) Viewed 2209 times
Walls opened up between 2 changing rooms, across the old Ref's room.
Home5.jpg
Home5.jpg (3.65 MiB) Viewed 1958 times
Walls down - looking down what will be the new corridor, and out of the players exit to pitch.
Home6.jpg
Home6.jpg (3.4 MiB) Viewed 1958 times
Across both changing rooms - a view last seen 1922 I guess when the stand was built.
Home7.jpg
Home7.jpg (3.33 MiB) Viewed 1958 times
Looking toward where the Players Entry door will be reinstated.
Home8.jpg
Home8.jpg (3.6 MiB) Viewed 1958 times
Also retained the original Referee's Sign (which we had repainted as part of the works last year to restore it a bit), for use on new Primary Officials Changing Room.
Home9.jpg
Home9.jpg (3.02 MiB) Viewed 1958 times

DAY 2 (Replacement of Walls - 30cm outwards) - Friday Feb 22nd

Nice misty morning to start the walls going up...and opening up the original Player entry door to fit new one.
Home10.jpg
Home10.jpg (2.71 MiB) Viewed 1955 times
Setting out positions on corridor walls - and double checking we'll end up with a room > 18 metre squared.
Home11.jpg
Home11.jpg (4 MiB) Viewed 1955 times
First wall going up on Away changing room side.
Home12.jpg
Home12.jpg (5.29 MiB) Viewed 1955 times
Doorway opened up and new Frame/Window/Door fitted.
Home13.jpg
Home13.jpg (4.76 MiB) Viewed 1955 times
Walls rising both side...
Home14.jpg
Home14.jpg (4.69 MiB) Viewed 1955 times
The new entry door (this will be painted Black as per all other external doors).
Home15.jpg
Home15.jpg (3.32 MiB) Viewed 1955 times
An old sign uncovered when taking down some signage on outside wall (kept to one side for now).
Home16.jpg
Home16.jpg (4.32 MiB) Viewed 1955 times
Corridor view out to the pitch
Home17.jpg
Home17.jpg (3.83 MiB) Viewed 1955 times
Home changing room
Home18.jpg
Home18.jpg (3.58 MiB) Viewed 1955 times
View down the corridor
Home19.jpg
Home19.jpg (3.49 MiB) Viewed 1955 times
Closer view of doorway and skylight.
Home20.jpg
Home20.jpg (4.06 MiB) Viewed 1955 times
This concluded the main works that week.

Re-checked the measurements again...

First the AWAY - 18.1 OK!
MeasureAway.jpg
MeasureAway.jpg (2.97 MiB) Viewed 1954 times
And HOME - 18.4 OK! (Am sure the players will notice the difference.)
MeasureHome.jpg
MeasureHome.jpg (1.63 MiB) Viewed 1954 times
We then had some volunteers in over the weekend, on Sunday morning once the walls had gone off to start to give it an initial coat of Masonry Paint/Sealer etc.. before the builders finished off the rest of the walls - this was just to give us a head start for later in the week to get as much finish done before match.

The materials...
paint1.jpg
paint1.jpg (4.15 MiB) Viewed 1953 times
First coat...
paint2.jpg
paint2.jpg (117.87 KiB) Viewed 1953 times
paint3.jpg
paint3.jpg (94.16 KiB) Viewed 1953 times
paint4.jpg
paint4.jpg (155.87 KiB) Viewed 1953 times
DAY 3 (Builders Complete Walls) - Monday Feb 25th

Walls infil completed, and additional supports added in ceiling above.
HR5.jpg
HR5.jpg (42.41 KiB) Viewed 1953 times
HR11.jpg
HR11.jpg (45.51 KiB) Viewed 1953 times
Fire protected ceiling cover
HR13.jpg
HR13.jpg (43.67 KiB) Viewed 1953 times
DAY 4 (Benches going back in) - Tuesday Feb 26th

Benches put back with some adjustments - and basic cleaning done. Main Build work complete - some plumbing reinstatement work and corridor ceiling platering to follow.
AwayBench1.jpeg
AwayBench1.jpeg (371.32 KiB) Viewed 1953 times
AwayBench3.jpeg
AwayBench3.jpeg (286.36 KiB) Viewed 1953 times
Nearing the final stretch - some more painting to be done (probably some on Friday), though full final finish may be after this first game - but all facilities back in rooms - sockets/heaters restored as well, which was the key thing with the tight timescales in which to get this work done.

Away changing room heater put back (Home is the same).
AwayHeater.jpeg
AwayHeater.jpeg (270.79 KiB) Viewed 1951 times
Away changing room sockets (for tunes)/usb points (for phones), for player phone charging - and a shelf for phones also...yes we provide them in home as well. This was to prevent players always coming into the stand office to ask for charging points - we've had these since last season. [We do NOT provide USB cables.]
AwayShelf.jpg
AwayShelf.jpg (3.37 MiB) Viewed 1951 times
(Note - feel free to swivel your head for this one....)

New sensor/lighting fitted in corridor - no switch, will come on as needed.
Corridor1.jpeg
Corridor1.jpeg (190.06 KiB) Viewed 1951 times
Lights, Action!
Corridor2.jpeg
Corridor2.jpeg (389.12 KiB) Viewed 1951 times
The Officials Bells reinstated in each changing room, with the buttons in the Officials Room (just relocated the existing simple wireless doorbells we use for that). Most teams ignore them anway and await the officials banging on the door for the proper signal.

And bar some extra painting (Extra Masonry coats, Main Door inside/outside, Redo Anti-Slip on Changing Room floors/corridor), some cleaning, and a few minor bits (door stops/bolts etc..) and pieces that concludes the work to rejig the changing room to be compliant for the FA.
Dazzler
The Staff
Posts: 5360
Joined: Sun Dec 27, 2009 9:00 pm
Has Liked: 1 time
Been Liked: 87 times

Re: [ Ground Grading Update ]

Post by Dazzler »

--
2/ A crane will be at Hayden Road on Monday 25th February to reconfigure the Peter Debanke end.
--

This was moved to Wednesday 27th February in the end, due to a scheduling change - but we had a nice clear/windless day for this work to be done, which moved Dale's Bar and the Club Shop to a central position behind the current concrete pad on some newly prepared pads.

These will sit in an area (a bit like Dale's Bar before) set back and between the new 150 seater stand (where old Stand and Dale's Bar were), and the Peter DeBanke Stand - which is moving 11 meters to the right - closer to the gate.

Note: The move/skate of Dale's Bar is to happen in a week or so's time - around 9th March with the current schedule.

Top End Rejig/Move Preparation

This pre-work included much clearing of the ground behind the DeBanke to allow the relocation of Dale's Bar and the Shop - including removing rubble from the previous years Main Stand demolition works (the old steps etc..), moving soil to form a new banked area along the fence boundary in the left hand back corner area, and forming the area for the pads for the moved units. In addition due to other logistics with building the new stand, and the equipment needed for that (Telehandler etc..) we wanted to maintain 3 meters access behind the stands/shop etc.. This also makes available some space for potential future use - though access is the main key.

As part of that prep - the Emergency Pitch Access gate was moved to nearer the corner, so straight on from the main gate, and the gates now lift out for ease of access too if required. (This was work we had planned to do last summer but ran out of time.)

Most of this pre-work happened in early February.

GATE Rejig - Gate moved from opposite Club Shop to corner.
Gate1.jpg
Gate1.jpg (3.98 MiB) Viewed 1946 times
Gate2.jpg
Gate2.jpg (3.7 MiB) Viewed 1946 times
Gate3.jpg
Gate3.jpg (3.9 MiB) Viewed 1946 times
Gate4.jpg
Gate4.jpg (4.31 MiB) Viewed 1946 times
RUBBLE Clearance - Got a skip loaned and rubble went away to be crushed/used.

As available...
RubbleAvailable.jpg
RubbleAvailable.jpg (4.71 MiB) Viewed 1931 times
All in the skip
RubbleCleared.jpg
RubbleCleared.jpg (4.61 MiB) Viewed 1931 times
Dazzler
The Staff
Posts: 5360
Joined: Sun Dec 27, 2009 9:00 pm
Has Liked: 1 time
Been Liked: 87 times

Re: [ Ground Grading Update ]

Post by Dazzler »

--
3/ On Saturday 9th March, the Peter Debanke Stand will be moved to the right by 11 metres (when looking from the pitch) to accommodate the new 150 seat stand, which will replace the current Mick George stand.
--

With the move of the other units onsite - the prep work for this move is almost complete. Datona (who put the stand up) will be onsite after Saturday's match to unbolt this stand from the pad, so it can be moved across 11m. This will then expose the new locations of the Shop/Dale's Bar.

The area in front of the new shop/bar location will be stoned, and then concreted. We could potentially also look in time at having some sort of covered area between DeBanke and new stand for that area too.

Note: Dale's Bar and the Club shop will NOT be open for the game on Saturday 2nd March. We have some work to prep the access, and also to restore power/data/comms to the units - which should be open for the Saturday 16th March game all being well with the prep. Also note - the press guys will have no power sockets available in Chris Ruff stand just for this Saturday only.

<Placeholder - Updates to follow>
Dazzler
The Staff
Posts: 5360
Joined: Sun Dec 27, 2009 9:00 pm
Has Liked: 1 time
Been Liked: 87 times

Re: [ Ground Grading Update ]

Post by Dazzler »

--
4/ During March, Stadium Solutions will start to install the new stand.
--

You can follow these guys - currently installing at another ground before they get to us. Our stand is in Manufacturing at present.
The stand is assembled on site and is totally removable as required, just like the turnstiles, DeBanke etc...

Stadium Solutions

The new 150 seater stand will be located at the left-hand side in the area previously covered by the Mick George Stand, and Dale's Bar - it's about 17m wide. There will then be a gap to the DeBanke and in that gap - set back from the existing concrete pad by about a meter (to be infilled soon), you will access Dale's Bar and The Club shop (the stands will overlap these slightly at each side from a front view).

We may (at some point) look at covering part of the area between the 2 stands and Dale's Bar/Shop as well.

<Placeholder>
Dazzler
The Staff
Posts: 5360
Joined: Sun Dec 27, 2009 9:00 pm
Has Liked: 1 time
Been Liked: 87 times

Re: [ Ground Grading Update ]

Post by Dazzler »

NOTE: Further updates/pics to go on during the day in the sections above.
Formic
Posts: 4151
Joined: Tue Dec 22, 2009 8:48 pm
Has Liked: 11 times
Been Liked: 19 times

Re: [ Ground Grading Update ] Works Progress ahead of Sat 2nd March Match

Post by Formic »

It always amazes me how we manage to achieve upgrades like this - and this time it is even more impressive as the work is having to be done mid season. I'm sure the FA don't lose a moments sleep considering all the effort clubs have to go to in order to meet ground grading, alongside them squandering so much money building the new Wembley.
BartonRaz
Posts: 5665
Joined: Tue Dec 22, 2009 10:56 pm
Location: Irthlingborough
Has Liked: 4 times
Been Liked: 136 times

Re: [ Ground Grading Update ] Works Progress ahead of Sat 2nd March Match

Post by BartonRaz »

Thanks Dazzler. Nice to be able to see what's going on. Thanks also to the volunteers doing their bit to ensure we remain at this level of football. :clapping:
They say we've lost our money we're not famous anymore.....

AFC Rushden & Diamonds - Member No: 291
Pigman
Posts: 4301
Joined: Thu Dec 24, 2009 4:14 pm
Location: Bedford
Has Liked: 5 times
Been Liked: 30 times

Re: [ Ground Grading Update ] Works Progress ahead of Sat 2nd March Match

Post by Pigman »

I just want to say a heartfelt thank you to everyone giving their time to this - volunteering to do this kind of thing is very rewarding, you get a real buzz from being involved.

I’m gutted I can’t give the time at the moment to help, but my job and family commitments just won’t allow it at the moment - but :notworthy: to all those who can and are!! Can’t wait to see the fruits of your labour !!
RIP Dale Roberts - gone, but never forgotten !!
AFC Rushden & Diamonds Membership No. 51