A final cross ways manual cut last week before main mower returned from service.

HR8.jpg
HR8.jpg (3.46 MiB) Viewed 4095 times
Dazzler
The Staff
Posts: 5411
Joined: Sun Dec 27, 2009 9:00 pm
Has Liked: 1 time
Been Liked: 92 times

Re: Hayden Road - Pitch & Ground Maintenance Updates

Post by Dazzler »

Emergency/Stand lighting added to both main stands at DeBanke end - 3 Units in each stand. Will be controlled by stewards pre-match/half time if needed. In the event of a floodlight failure they will activate automatically to ensure visibility for exiting stands.

HR6.jpg
HR6.jpg (1.79 MiB) Viewed 4094 times
HR7.jpg
HR7.jpg (1.51 MiB) Viewed 4094 times

Central Unit fitted above stand signage to highlpight that as well as act as general lighting. Others are above the exit walkways of the stand.

HR4.jpg
HR4.jpg (1.54 MiB) Viewed 4094 times

Central Unit in Peter DeBanke Stand.

HR5.jpg
HR5.jpg (1.26 MiB) Viewed 4094 times
Dazzler
The Staff
Posts: 5411
Joined: Sun Dec 27, 2009 9:00 pm
Has Liked: 1 time
Been Liked: 92 times

Re: Hayden Road - Pitch & Ground Maintenance Updates

Post by Dazzler »

Updated League "Pitching In" signage received this week and fitted close to half way line either side. (PItch Side Boards to be repainted still).

HR2.jpg
HR2.jpg (2.56 MiB) Viewed 4093 times
HR3.jpg
HR3.jpg (1.3 MiB) Viewed 4093 times
Dazzler
The Staff
Posts: 5411
Joined: Sun Dec 27, 2009 9:00 pm
Has Liked: 1 time
Been Liked: 92 times

Re: Hayden Road - Pitch & Ground Maintenance Updates

Post by Dazzler »

Final Pitch Prep and re-lining by Groundsman ahead of RHUFC's match on Saturday 17th April (12:30 v Long Buckby) - Behind Closed Doors.

HR1.jpg
HR1.jpg (2.9 MiB) Viewed 4091 times
Dazzler
The Staff
Posts: 5411
Joined: Sun Dec 27, 2009 9:00 pm
Has Liked: 1 time
Been Liked: 92 times

Re: Hayden Road - Pitch & Ground Maintenance Updates

Post by Dazzler »

Reminder on volunteers etc..(as posted above).

VOLUNTEERING
We have a small whatsapp group with people who have volunteered in the past which I tend to communicate on to grab people when needed to do the tasks - socially distanced etc.. as required these days. If you are not already on it, and wish to be added just message me directly on here via DM (not posted in this thread), and I can add you to the group. I'll try to have a few weekday daytime slots, as well as some weekend Sat/Sun slots too.

Post Match Pitch volunteers - also if anyone would like to volunteer to help do basic post match work, the groundsman is looking for a few people to spend 20-40 mins post match on the pitch to do general divoting repairs. The groundsman will do the relevant training with you. Ideally we want people that can do it regularly immediately after matches where possible (Saturdays and Weeknights). Again DM me privately on here and will add you to the relevant whatsapp group or I can grab your contact info (phone/sms/email). Generally for this you'd come to the area near turnstiles post match to collect forks/bib etc.. and then do some repairs on an allocated part of the pitch. The best time for all repairs is immediately post match in most cases - though often at present we do the following day or during Monday after a Saturday match which isn't ideal.
Dazzler
The Staff
Posts: 5411
Joined: Sun Dec 27, 2009 9:00 pm
Has Liked: 1 time
Been Liked: 92 times

Re: Hayden Road - Pitch & Ground Maintenance Updates

Post by Dazzler »

Last week the remaining work on the conifer trimming was completed (as started end of March, after platform was repaired).

Thanks to Vernon and the team at Tree Solutions for the work, with the pitch and walkways left immaculate after the works. Highly recommended.

HR20200407.jpg
HR20200407.jpg (1.06 MiB) Viewed 3903 times

A few pictures from the works follow. The conifers were trimmed to leave green live growth to retain the look and infill, without cutting back into the dead part of the core of the tree (as we did for the lower parts along the walkway to give headroom height along there previously). There are 2 types of trees - hence the colour change near Chris Ruff stand.

HR20200408.jpg
HR20200408.jpg (1.81 MiB) Viewed 3903 times
HR20200409.jpg
HR20200409.jpg (905.21 KiB) Viewed 3903 times
Dazzler
The Staff
Posts: 5411
Joined: Sun Dec 27, 2009 9:00 pm
Has Liked: 1 time
Been Liked: 92 times

Re: Hayden Road - Pitch & Ground Maintenance Updates

Post by Dazzler »

The bulk of the work this time was to do the area left last time in Jan 2019, above Chris Ruff Stand down to the corner. This was starting to impinge on the floodlights and also causing pitch shadows which ultimately would lead to flood light level reading failures - hence it's key to clear around the floodlights in particular.

Some 6-10 foot was taken off the depth in this area - to bring back in line with the floodlights, whilst ensuring we kept the conifer foliage/cover.

The other side that was done back in Jan 2019, had another 2ft taken off (the regrowth), so we should have a good 4-5 years before another full trim is needed. We may need a simpler trim at some point close to the floodlights potentially.

Chris Ruff stand end - level trim in line with floodlights as far as possible. A few areas the amount taken off was such that it may not grow back with foliage/coverage - but that was limited to a few small areas.

HR20200401.jpg
HR20200401.jpg (2.63 MiB) Viewed 3903 times
HR20200403.jpg
HR20200403.jpg (2.8 MiB) Viewed 3903 times
HR20200404.jpg
HR20200404.jpg (2.43 MiB) Viewed 3903 times
HR20200402.jpg
HR20200402.jpg (2.7 MiB) Viewed 3903 times
Dazzler
The Staff
Posts: 5411
Joined: Sun Dec 27, 2009 9:00 pm
Has Liked: 1 time
Been Liked: 92 times

Re: Hayden Road - Pitch & Ground Maintenance Updates

Post by Dazzler »

The council also happened to resurface the road outside Hayden Road over the weekend as well.

HR20200405.jpg
HR20200405.jpg (2.62 MiB) Viewed 3903 times
Dazzler
The Staff
Posts: 5411
Joined: Sun Dec 27, 2009 9:00 pm
Has Liked: 1 time
Been Liked: 92 times

Re: Hayden Road - Pitch & Ground Maintenance Updates

Post by Dazzler »

The finished work - trimmed end to end.
HR20200410.jpg
HR20200410.jpg (2.51 MiB) Viewed 3869 times
Dazzler
The Staff
Posts: 5411
Joined: Sun Dec 27, 2009 9:00 pm
Has Liked: 1 time
Been Liked: 92 times

Re: Hayden Road - Pitch & Ground Maintenance Updates

Post by Dazzler »

Most of the LED Walkway lighting for the far side is now in place - alongside some fence panel replacements.

This is low level lighting designed to just light up the footpath, replacing the individual battery/motion units we had before to increase coverage.

HR2021042802.jpeg
HR2021042802.jpeg (207.73 KiB) Viewed 3758 times
LED Walkway lighting (note: This is without floodlights on, which would normally be on when spectators are in the ground, these just help to improve low level visibility).